Name of the Project
Widening, Strengthening and reconstruction of Ajmer-Bhilwara-Chittorgarh Road...
Project Description: |
Widening, Strengthening and reconstruction of Ajmer-Bhilwara-Chittorgarh Road (World Bank Project) from km.1/175 to km.186/0 |
|
Length of the Road: 186 Kms |
Share in the Joint Venture: 50% - 50% |
Client name: Chief Engineer, Roads-II, PWD, Jaipur, Rajasthan, India. |
Key Items in the Contract
a) Earthworks |
27,67,169 m3 |
b) WBM Gr.I, II & III |
61,733.90 m3 |
c) Bituminous Macadam |
1,18,009 m3 |
d) Lean Bituminous Macadam |
78,121 m3 |
e) Dense Bituminous Macadam |
18,331 m3 |
f) Single Coat Surface Dressing |
1,65,977 m2 |
g) Tack / Prime Coat |
50,13,529 m2 |
|
Bridge Details
h) Major / Minor Bridges |
1 / 19 |
i) Slab / Pipe Culvets |
84 / 26 |
j) Bypass at Nasirabad |
10.585 kms |
k) Inter Sections / Junctions |
31 |
l) Temporary Diversion Roads |
2 kms |
m) Vertical Improvements/Restructuring |
3.255 kms |
n) Horizontal Curves / Realignments |
15 |
|
Consultant’s name: SMEC-ICT, Austrialia |
Contract value in INR Millions / US$ Mill: 442.1 |
Completion value in INR Millions / US$ Mill: 782.90 / 22.30 |
Commencement Date: 21-Dec-1991 |
Completion Date (Original): 30-Nov-1995 |
Revised Completion Date: 31-May-96 |
Name of the Contractor: Progressive Constructions - Seenaiah & Co. J.V. |
JV Partners: Progressive Constructions Ltd. - B.Seenaiah & Co. |
Name of the Project
Improvements to Ankola-Hubli Road (SH-42) Reach S-7 from Km.75/0 to 132/480
Project Description: |
Improvements to Ankola-Hubli Road (SH-42) Reach S-7 from Km.75/0 to 132/480 |
|
JV Partners: Progressive Constructions Ltd. - B.Seenaiah & Co. |
Share in the Joint Venture: 50% - 50% |
Client name: Chief Engineer, PWD, Karnataka. |
Key Items in the Contract
a) Earthworks |
3,64,355 m3 |
b) WBM Gr.I, II & III |
57,990 m3 |
c) Bituminous Macadam |
12,533 m3 |
d) Dense Bituminous Macadam |
40,339 m3 |
e) Single Coat Surface Dressing |
1,13,870 m2 |
f) Tack / Prime Coat |
13,35,220 m2 |
|
Bridge Details
g) Minor Bridges |
3 |
h) Slab / Pipe Culvets |
102 / 12 |
i) Temporary Diversion Roads |
2 kms |
j) Vertical Improvements/Restructuring |
3.255 kms |
|
Consultant’s name: RITES with AHRC Division, Yellapur |
Contract value in INR Millions / US$ Mill: 201.21 |
Completion value in INR Millions / US$ Mill: 283.24 / 7.75 |
Commencement Date: 1-Jan-92 |
Completion Date (Original): 11-Dec-95 |
Revised Completion Date: 20-Feb-96 |
Name of the Contractor: Progressive Constructions - Seenaiah & Co. J.V. |
Name of the Project
Four laning and strengthening of existing two lanes from Gurgaon in Haryana...
Project Description: |
Four laning and strengthening of existing two lanes from Gurgaon in Haryana (Km.36.635) to Kotputli in Rajasthan (Km.162.500) of NH-8, India |
|
Client name: National Highways Authority of India, Plot No.G-5 & 6, Sector-10, Dwarka, New Delhi |
Share in the Joint Venture: 50% - 25% - 25% |
Consultant’s name: SMEC |
Key Items in the Contract
a) Earthworks |
25,09,532 m3 |
b) GSB |
6,22,373 m3 |
c) WMM |
5,67,104 m3 |
d) Prime Coat |
12,89,510 m2 |
e) Tack Coat |
9,00,046 m2 |
f) DBM + PCC |
3,67,725 m3 |
g) BC |
98,501 m3 |
h) Cement Concrete Kerb |
2,64,710 Lm |
|
Bridge Details
i) ROB / RUB |
|
j) Major / Minor Bridges |
|
k) Slab / Pipe Culvets |
|
l) Drains |
35,855 m3 |
m) Bored Cast-in-situ piles |
653.40 Lm |
|
Contract value in INR Millions / US$ Mill: 2646.56 / 74.12 |
Completion value in INR Millions / US$ Mill: 3408.05 / 72.94 |
Commencement Date: 2-Sep-97 |
Completion Date (Original): 2-Mar-01 |
Revised Completion Date: 20-Mar-01 |
Name of the Contractor: BSC - RBM - PATI Joint Venture |
JV Partners: B.Seenaiah & Co., - Road Builder (M) Sdn Bhd - Pati Sdn Bhd. |
Name of the Project
Four laning including strengthening of existing two lane pavement from Raniganj...
Project Description: |
Four laning including strengthening of existing two lane pavement from Raniganj to Panagarh in the State of West Bengal of NH-2, India |
|
Client name: National Highways Authority of India, Plot No.G-5 & 6, Sector-10, Dwarka, New Delhi. |
Share in the Joint Venture: 50% - 25% - 25% |
Consultant’s name: Symonds Travers Morgan |
Key Items in the Contract
a) Earthworks |
14,14,452 m3 |
b) GSB |
2,44,915 m3 |
c) WMM |
2,02,940 m3 |
d) Prime Coat |
99,39,494 m3 |
e) Tack Coat |
89,93,904 m3 |
f) BM |
21,439 m3 |
g) DBM |
1,21,776 m3 |
h) BC |
28,761 m3 |
i) Cement Concrete Kerb |
95,893 m3 |
|
Bridge Details
j) ROB / RUB |
2 |
k) Flyover |
1 |
l) Major / Minor Bridges |
3 / 7 |
m) Slab / Pipe Culvets |
83 / 34 |
n) Drains |
11,725 m3 |
o) Bored Cast-in-situ piles |
1679 Lm |
|
Contract value in INR Millions / US$ Mill: 1607.91 / 44.82 |
Completion value in INR Millions / US$ Mill: 2110.00 / 43.88 |
Commencement Date: 4-Jul-97 |
Completion Date (Original): 3-Jan-01 |
Revised Completion Date: 30-Nov-01 |
Name of the Contractor: BSC - RBM - PATI Joint Venture |
JV Partners: B.Seenaiah & Co., - Road Builder (M) Sdn Bhd - Pati Sdn Bhd |
Name of the Project
Four laning including strengthening of existing two lane pavement from Barwa Adda to Barakar...
Project Description: |
Four laning including strengthening of existing two lane pavement from Barwa Adda to Barakar in the State of Bihar (Jharkhand) of NH-2, India |
|
Client name: National Highways Authority of India, Plot No.G-5 & 6, Sector-10, Dwarka, New Delhi. |
Share in the Joint Venture: 50% - 25% - 25% |
Consultant’s name: Symonds Travers Morgan |
Key Items in the Contract
a) Earthworks |
16,54,045 m3 |
b) GSB |
2,77,115 m3 |
c) WMM |
1,90,295 m3 |
d) Prime Coat |
4,73,527 m2 |
e) Tack Coat |
13,33,860 m2 |
f) BM |
26,582 m3 |
g) DBM |
1,20,181 m3 |
h) BC |
15,387 m3 |
i) Cement Concrete Kerb |
91,599 m3 |
|
Bridge Details
j) ROB / RUB |
|
k) Flyover |
|
l) Major / Minor Bridges |
1 |
m) Slab / Pipe Culvets |
|
n) Drains |
11,725 m3 |
o) Bored Cast-in-situ piles |
653.40 Lm |
|
Contract value in INR Millions / US$ Mill: 1339.15 / 37.48 |
Completion value in INR Millions / US$ Mill: 1930.00 / 40.28 |
Commencement Date: 13-Dec-96 |
Completion Date (Original): 12-Jun-00 |
Revised Completion Date: 22-Dec-01 |
Name of the Contractor: BSC - RBM - PATI Joint Venture |
JV Partners: B.Seenaiah & Co., - Road Builder (M) Sdn Bhd - Pati Sdn Bhd |
Name of the Project
Rehabilitation & Upgradation to 4/6 lane divided carriageway for Package KU-IV from Bhilwara Bypass...
Project Description: |
Rehabilitation & Upgradation to 4/6 lane divided carriageway for Package KU-IV from Bhilwara Bypass (Km.120/0 of NH-79) to Chittorgarh (Km.183/0 of NH-79) in the State of Rajasthan |
|
Client name: National Highways Authority of India, Plot No.G-5 & 6, Sector-10, Dwarka, New Delhi. |
Key Items in the Contract
a) Earthworks |
19,38,439 m3 |
b) GSB |
2,32,154 m3 |
c) WMM |
1,03,373 m3 |
d) Prime Coat |
3,85,708 m2 |
e) Tack Coat |
11,48,240 m2 |
f) Profile Corrective Course |
12,706 m3 |
g) DBM |
93,448 m3 |
h) BC |
18,073 m3 |
i) Dry Lean Concrete |
65,700 m3 |
j) Pavement Quality Concrete |
1,24,221 m3 |
k) Dry Lean Concrete |
70,534 m3 |
|
Bridge Details
l) ROB / RUB |
2 nos RoB (2 spans of 18.536 mts and 2 spans 21.989
mtrs with RCC Girders |
m) Flyover |
2 spans of 18.536 mts and 2 spans of 21.989 mts RCC
girders |
n) Major / Minor Bridges |
2 nos 11 spans of 37.0 mtrs each /
11 nos of span 6.60 to 8.80 mtrs |
o) Slab / Pipe Culvets |
38 / 44 |
p) Drains |
7,427 m3 |
q) Bored Cast-in-situ piles |
653.40 Lm |
|
Consultant’s name: SNC-Lavalin International Inc. |
Contract value in INR Millions / US$ Mill: 1510.40 / 32.03 |
Completion value in INR Millions / US$ Mill: 1774.00 / 38.29 |
Commencement Date: 28-Nov-01 |
Completion Date (Original): 16-May-04 |
Revised Completion Date: 20-Aug-04 |
Name of the Contractor: B.Seenaiah & Company (Projects) Limited |
Name of the Project
Widening of existing 2-lanes to 6-lanes divided carriageway facility including rehabilitation of existing 2-lanes...
Project Description: |
Widening of existing 2-lanes to 6-lanes divided carriageway facility including rehabilitation of existing 2-lanes from km.273.500 to km.363.885 on Jaipur-Kishangarh section of NH-8 in Rajasthan |
|
Client name: GVK Jaipur-Kishangarh Expressway Limited. |
Key Items in the Contract
a) Earthworks |
21,92,816 m3 |
b) GSB |
3,75,000 m3 |
c) WMM |
3,27,430 m3 |
d) Prime Coat |
11,54,556 m2 |
e) Tack Coat |
43,71,629 m2 |
f) BM |
89,973 m3 |
g) DBM |
1,33,188 m3 |
h) BC |
68,028 m3 |
i) Dry Lean Concrete |
17,834 m3 |
|
Bridge Details
j) Flyover |
2 |
k) Major / Minor Bridges |
1 / 7 |
l) Slab / Pipe Culvets |
|
m) Drains |
|
|
Consultant’s name: Lea Associates South Asia Pvt. Ltd. |
Contract value in INR Millions / US$ Mill: 2389.80 / 50.12 |
Completion value in INR Millions / US$ Mill: 2389.80 / 54.63 |
Commencement Date: 28-Mar-03 |
Completion Date (Original): 27-Mar-05 |
Revised Completion Date: 27-Mar-05 |
Name of the Contractor: B.Seenaiah & Company (Projects) Limited. |
Name of the Project
Widening & strengthening of existing 2-lane carriageway of NH-60 from Laxmannath...
Project Description: |
Widening & strengthening of existing 2-lane carriageway of NH-60 from Laxmannath (Km.53.410) to Kharagpur (Km.119.275) in state of West Bengal, India |
|
Client name: National Highways Authority of India, Plot No.G-5 & 6, Sector-10, Dwarka, New Delhi. |
Key Items in the Contract
a) Earthworks |
73,39,893 m3 |
b) GSB |
3,37,877 m3 |
c) WMM |
18,066 m3 |
d) Prime Coat |
82,090 m2 |
e) Tack Coat |
1,36,345 m2 |
f) BC |
2,07,719 m2 |
g) Dry Lean Concrete |
1,89769 m3 |
h) Pavement Quality Concrete |
1,89769 m3 |
i) Bituminous Mastic Course |
1,89769 m3 |
|
Bridge Details
j) Flyover |
2 |
k) Major / Minor Bridges |
1 / 7 |
l) Slab / Pipe Culvets |
|
m) Drains |
11,404 Lm |
|
Consultant’s name: Louis Berger International Inc. |
Contract value in INR Millions / US$ Mill: 3293.29 / 70.17 |
Completion value in INR Millions / US$ Mill: 3419.94 / 74.68 |
Commencement Date: 30-May-01 |
Completion Date (Original): 29-Feb-04 |
Revised Completion Date: 25-May-06 |
Name of the Contractor: B.Seenaiah & Company (Projects) Limited. |
Name of the Project
Four laning of Satara Kolhapur upto Maharashtra State Border Section of NH-4 Phase...
Project Description: |
Four laning of Satara Kolhapur upto Maharashtra State Border Section of NH-4 Phase - I (Km 592.240 to Km.616.000) |
|
Client name: Maharashtra State Road Development Corporation Ltd. |
Share in the Joint Venture: 50% - 50% |
Consultant’s name: CES (India) Pvt. Ltd. |
Key Items in the Contract
a) Earthworks |
10,96,655 m3 |
b) GSB |
1,23,007 m3 |
c) WMM |
36,053 m3 |
d) Prime Coat |
2,02,390 m2 |
e) Tack Coat |
7,37,758 m2 |
f) BM |
11,409 m3 |
g) DBM + PCC |
23,684 m3 |
h) BC |
9,228 m2 |
i) Dry Lean Concrete |
26,691 m3 |
j) Pavement Quality Concrete |
53,250 m3 |
k) Cement Concrete Kerb |
4,186 m3 |
|
Bridge Details
l) Major / Minor Bridges |
1 bridge 7 spans of 20.7 mtrs each - length 148 mtrs |
m) Slab / Pipe Culvets |
|
|
Contract value in INR Millions / US$ Mill: 787.67 / 16.32 |
Completion value in INR Millions / US$ Mill: 889.10 / 19.67 |
Commencement Date: 3-May-02 |
Completion Date (Original): 31-Dec-05 |
Revised Completion Date: 31-Dec-05 |
Name of the Contractor: BSCPL-SCL JOINT VENTURE. |
Name of the Project
Design-Build Contract for the Rehabilitation of Kandahar to Spin Boldak Road...
Project Description: |
Design-Build Contract for the Rehabilitation of Kandahar to Spin Boldak Road (Section Km.0+163 to Km.61+440 and from Km.89+771 to Km.90+611) |
|
Client name: Ministry of Public Works, Islamic Republic of Afghanisthan, Afghanisthan. |
Share in the Joint Venture: 50% - 50% |
Consultant’s name: Sheladia Associates Inc., USA |
Key Items in the Contract
a) Earthworks |
10,96,655 m3 |
b) GSB |
1,23,007 m3 |
c) WMM |
36,053 m3 |
d) Prime Coat |
2,02,390 m2 |
e) Tack Coat |
7,37,758 m2 |
f) DBM |
23,684 m3 |
g) BC |
9,228 m2 |
|
Bridge Details
h) Major / Minor Bridges |
3 bridges of 316.65 mts, 190 mts & 280 mtrs |
i) Slab / Pipe Culvets |
136 |
j) Drains |
8,099 mts |
k) Causeways |
1,057 mts |
|
Contract value in US$ Mill: 24.17 |
Completion value in US$ Mill: 23.34 |
Commencement Date: 15-May-03 |
Completion Date: 26-Nov-05 |
Name of the Contractor: BSC-C&C JOINT VENTURE. |
Name of the Project
Rehablitation of Economic Facilities & Services REFS Program - Design-Build, Contract for the Rehabilitation...
Project Description: |
Rehablitation of Economic Facilities & Services REFS Program - Design-Build, Contract for the Rehabilitation of the "Section E" (85 Km stretch from Km.262 to Km.347) of Kabul-Kandahar Highway |
|
Client name: United States Agency for International Development, Kabul, Afhanistan. |
Share in the Joint Venture: 50% - 50% |
Consultant’s name: Louis Berger Group Inc., USA |
Key Items in the Contract
a) Earthworks |
14,47,424 m3 |
b) GSB |
2,76,501 m3 |
c) WMM |
1,50,826 m3 |
d) BM |
2,72,217 Mt |
e) BC |
79,293 Mt |
f) SBST |
54,469 m2 |
|
Bridge Details
g) Major / Minor Bridges |
16 nos with total length of 768 mts |
h) Slab / Pipe Culvets |
338 |
i) Causeways |
3 nos |
|
Contract value in US$ Mill: 39.93 |
Completion value in US$ Mill: 44.19 |
Commencement Date: 31-May-03 |
Completion Date: 26-Jun-05 |
Name of the Contractor: BSC-C&C JOINT VENTURE. |
Name of the Project
Rehablitation of Economic Facilities & Services REFS Program - Kandahar...
Project Description: |
Rehablitation of Economic Facilities & Services REFS Program - Kandahar to Heart Highway Improvement Project - Phase II, Package V - Renovation and Reconstruction Km 456+000 to Km 557+462 |
|
Client name: United States Agency for International Development, Kabul, Afhanistan. |
Share in the Joint Venture: 50% - 50% |
Consultant’s name: Louis Berger Group Inc., USA |
Key Items in the Contract
a) Earthworks |
14,47,424 m3 |
b) GSB |
2,76,501 m3 |
c) WMM |
1,50,826 m3 |
d) BM |
2,72,217 Mt |
e) BC |
79,293 Mt |
f) SBST |
54,469 m2 |
g) Milling / Rubblization |
54,469 m2 |
|
Bridge Details
h) Major / Minor Bridges |
2 nos 70.50 mtrs & 408.90 mtrs / 8 nos |
i) Slab / Pipe Culvets |
31 / 197 |
|
Contract value in US$ Mill: 40.96 |
Completion value in US$ Mill: 51.31 |
Commencement Date: 6-Oct-04 |
Completion Date: 23-Oct-06 |
Name of the Contractor: BSC-C&C JOINT VENTURE. |
Name of the Project
Reconstruction of Jalalabad to Asmar Road Km.0+000 to Km.121+500
Project Description: |
Reconstruction of Jalalabad to Asmar Road Km.0+000 to Km.121+500 |
|
Client name: United Nations Office for Project Services ( UNOPS) / United States Agency for International Development, Kabul, Afhanistan. |
Share in the Joint Venture: 50% - 50% |
Consultant’s name: Louis Berger Group Inc., USA |
Key Items in the Contract
a) Earthworks |
2,34,909 m3 |
b) GSB |
1,49,105 m3 |
c) WMM |
1,53,214 m3 |
d) Prime Coat |
8,78,891 m2 |
e) DBST |
17,57,460 m2 |
|
Bridge Details
f) Bridges |
10 |
g) Box / Pipe Culvets |
159 / 431 |
h) Causeways |
52 |
i) Drains |
13521 mtrs |
|
Contract value in US$ Mill: 40.65 |
Completion value in US$ Mill: 39.42 |
Commencement Date: 1-Nov-05 |
Completion Date: 4-Apr-07 |
Name of the Contractor: BSC-C&C JOINT VENTURE. |
Name of the Project
Rehabilitation of Taloqan-Kishem Road
Project Description: |
Rehabilitation of Taloqan-Kishem Road |
|
Client name: Ministry of Public Works, Islamic Republic of Afghanisthan, Afghanisthan. |
Commencement Date: 1-Feb-06 |
Consultant’s name: SMEC |
Completion Date : 19-Dec-07 |
Contract value in US$ Mill: 22.41 |
Name of the Contractor: BSC-C&C JOINT VENTURE |
Completion value in US$ Mill: 27.83 |
Share in the Joint Venture: 50% - 50% |
Name of the Project
Upgrading of Roads from Arcot to Ulundurpettai (Elvanasur), Polur to Chengam, Vriddhachalam to Tiruvarur...
Project Description: |
Upgrading of Roads from Arcot to Ulundurpettai (Elvanasur), Polur to Chengam, Vriddhachalam to Tiruvarur, Jayankondam to Ariyalur and New Bypass Roads at Chidambaram, Sirkazhi, Arani, Polur, Tiruvannamalai, Tirukkovilur, Vriddhachalam, Ariyalur and Tiruvar |
|
Client name: Project Director, Tamil Nadu Road Development Corporation, Chennai |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
11,18,354 m3 |
b) GSB |
4,75,653 m3 |
c) WMM |
2,68,758 m3 |
d) Prime Coat |
9,04,300 m2 |
e) Tack Coat |
22,45,614 m2 |
f) DBM |
1,23,598 m3 |
g) BC |
40,297 m3 |
h) Plain Cement Concrete |
32,863 m3 |
i) Reinforced Cement Concrete |
2,319 m3 |
j) Prestressed Concrete |
1,518 m3 |
k) Pile Foundation 750mm dia |
1,636 Lm |
l) Pile Foundation 900mm dia |
779 Lm |
m) Open Drains |
10,730 Lm |
n) Covered Drains |
|
o) Saucer Drains |
8,597 Lm |
p) Reinforcement |
621 Mt |
|
|
Consultant’s name: |
Contract value in US$ Mill: 1689.63 / 37.76 |
Completion value in US$ Mill: 2082.53 / 46.92 |
Commencement Date: 30-Nov-04 |
Completion Date: 15-Jun-09 |
Name of the Contractor: KMC - OSE - BSCPL J.V. |
Share in the Joint Venture: 331/3% - 331/3% - 331/3% |
Name of the Project
Rehabilitation and Upgradation of Bekaria-Gogunda Section (Km.29.00 to Km.73.00) of NH-76 to 4 lane...
Project Description: |
Rehabilitation and Upgradation of Bekaria-Gogunda Section (Km.29.00 to Km.73.00) of NH-76 to 4 lane divided carriageway configuration in the state of Rajasthan on East West Corridors [Contract Package No.EW-II (RJ-2)] |
|
Client name: National Highways Authority of India, Plot No.G5 & 6, Sector-10, Dwarka, New Delhi. |
Share in the Joint Venture: 50% |
Consultant’s name: |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
101,80,581 m3 |
b) GSB |
1,99,554 m3 |
c) WMM |
2,03,761 m3 |
d) WMM |
7,58,778 m2 |
e) Prime Coat |
17,39,820 m2 |
f) DBM |
90,954 m3 |
g) BC |
31,394 m3 |
h) Concrete |
1,97,358 m3 |
i) Tunnel Excavation |
1,03,743 m3 |
|
|
Contract value in INR Mill. / US$ Mill: 4115.00 / 89.47 |
Completion value in INR Mill. / US$ Mill: 4850.50 / 95.62 |
Commencement Date: 6-Nov-05 |
Completion Date: 28-Feb-07 |
Name of the Contractor: SOMA - BSCPL JV. |
Name of the Project
4-laning from km.551.00 to km.526.00 of Siliguri to Islampur section of NH-31 in West Bengal
Project Description: |
4-laning from km.551.00 to km.526.00 of Siliguri to Islampur section of NH-31 in West Bengal |
|
Client name: National Highways Authority of India, Plot No.G5 & 6, Sector-10, Dwarka, New Delhi. |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
9,37,053 m3 |
b) GSB |
1,29,888 m3 |
c) WMM |
84,005 m3 |
d) Prime Coat |
3,20,729 m2 |
e) Tack Coat |
12,27,340 m2 |
f) BM |
26,003 m3 |
g) DBM |
34,258 m3 |
h) BC |
34,258 m3 |
i) SDBC |
4,342 m3 |
j) PQC |
65,678 m3 |
k) DLC |
34,243 m3 |
l) Plain Cement Concrete |
35,085 m3 |
m) Reinforced Cement Concrete |
28,958 m3 |
n) Reinforcement |
3,157 Mt |
o) Pile Foundation 1200mm dia |
240 Lm |
p) Pile Foundation 1200mm dia |
231 Lm |
|
|
Consultant’s name: |
Contract value in INR Mill. / US$ Mill: 1588.94 / 35.83 |
Completion value inINR Mill. / US$ Mill: 2149.41 / 45.28 |
Commencement Date: 05-Apr-06 |
Completion Date: 04-Oct-08 |
Name of the Contractor: BSCPL Infrastructure Limited |
Share in the Joint Venture: 100% |
Name of the Project
Construction works related to widening/modification of roads to create multiple lanes of existing...
Project Description: |
Construction works related to widening/modification of roads to create multiple lanes of existing carriageway for high capacity bus system in Delhi - Section: Ambedkar Nagar to Delhi Gate |
|
Client name: Commissioner, Delhi Municipal Corporation, New Delhi. |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
30,866 m3 |
b) GSB |
21,082 m3 |
c) WMM |
15,736 m3 |
d) Prime Coat |
61,452 m2 |
e) Tack Coat |
7,66,068 m2 |
f) DBM |
59,332 m3 |
g) BM |
12,220 m3 |
h) BC |
14,194 m3 |
i) Mastic Asphalt |
1,72,982 m2 |
j) PQC |
27,278 m3 |
k) DLC |
4,795 m3 |
l) Plain Cement Concrete |
8,382 m3 |
m) Reinforcement |
415 Mt |
|
|
Consultant’s name: |
Contract value in INR Mill. / US$ Mill: 1290.78 / 27.93 |
Completion value inINR Mill. / US$ Mill: 1216.48 / 26.29 |
Commencement Date: 05-Spe-06 |
Completion Date: 26-Nov-09 |
Name of the Contractor: BSC-C&C Joint Venture |
Share in the Joint Venture: 50% |
Name of the Project
Four laning of Jhansi-Lakhnadon section km.255 to km 297 of NH-26 in the state of Madhya Pradesh
Project Description: |
Four laning of Jhansi-Lakhnadon section km.255 to km 297 of NH-26 in the state of Madhya Pradesh |
|
Client name: National Highways Authority of India, Plot No.G5 & 6, Sector-10, Dwarka, New Delhi. |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
35,64,850 m3 |
b) GSB |
2,53,985 m3 |
c) WMM |
2,13,007 m3 |
d) Prime Coat |
8,20,189 m2 |
e) Tack Coat |
21,49,884 m2 |
f) DBM |
62,037 m3 |
g) BM |
59,877 m3 |
h) BC |
28,075 m3 |
i) Mix Seal Surfacing Course |
88,768 m2 |
j) Plain Cement Concrete |
35,004 m3 |
k) Reinforced Cement Concrete |
33,686 m3 |
l) Pile Foundation 1200mm dia |
33,686 m3 |
m) Reinforcement |
3937 Mt |
n) Well Foundation |
339 Lm |
|
|
Consultant’s name: |
Contract value in INR Mill. / US$ Mill: 1896.30 / 41.35 |
Completion value inINR Mill. / US$ Mill: 2065.90 / 44.48 |
Commencement Date: 27-May-06 |
Completion Date: 05-Dec-09 |
Name of the Contractor: BSCPL Infrastructure Limited |
Share in the Joint Venture: 100% |
Name of the Project
Four Laning of Nagda to Simlada - Dosi / Sejawata from km.25.00 to km. 100.00 on SH-31...
Project Description: |
Four Laning of Nagda to Simlada - Dosi / Sejawata from km.25.00 to km. 100.00 on SH-31 Section in the State of Madhya Pradesh |
|
Client name: Pan India Infrastructures Private Limited. |
Key Items in the Contract
a) Earthwork Excv. & Embankment |
32,23,524 m3 |
b) GSB |
4,41,218 m3 |
c) WMM |
3,58,263 m3 |
d) Prime Coat |
13,27,612 m2 |
e) Tack Coat |
14,77,004 m2 |
f) DBM |
1,60,127 m3 |
g) BC |
55,074 m3 |
h) DLC |
1,542 m3 |
i) PQC |
2,926 m3 |
j) Plain Cement Concrete |
42,184 m3 |
k) Reinforced Cement Concrete |
30,132 m3 |
l) Reinforcement |
2,808 Mt |
|
|
Consultant’s name: |
Contract value in INR Mill. / US$ Mill: 3800.00 / 95.05 |
Completion value inINR Mill. / US$ Mill: 3435.50 / 73.52 |
Commencement Date: 01-Apr-08 |
Completion Date: 30-Dec-09 |
Name of the Contractor: BSCPL Infrastructure Limited |
Share in the Joint Venture: 100% |